This website uses cookies. For more information click here

FREE
NEWSLETTER

MEDIA-PLAN

BTJ free PDF archive

Poland

Vistula Spit to be dug through

Publication date: 2017-04-10

Tags: maritime, poland, russia

Vistula Spit to be dug through

The President of Poland has signed a special law enabling the setup of a sea canal which will link the Vistula Lagoon with the Gdańsk Bay.

Construction works of the approx. PLN 880 mln (ca. EUR 207 mln) worth canal are to start in 2018, set for completion four years later. The canal will be 1.3 km long, offering water depth of 5.0 m for seagoing vessels 100 m long, 20 m wide, and having a draught of 4.0 m.

The new infrastructure will directly connect the Polish Port of Elbląg with the Baltic Sea. Up-to-date, ships wanting to call at Elbląg have to pass the Russia-controlled Pilava Strait.

Vistula Spit canal (photo: Maritime Office in Gdynia)

Vistula Lagoon (photo: Wikimedia Commons)

Print

PARTNERS

Baltic Ports Organization

PARTNERSHIP
EVENTS

Polish LNG Conference

Polish LNG Conference

22-23 November 2017 • PL/Warsaw

TRANSLOG Connect Congress

TRANSLOG Connect Congress

22-23 November 2017 • HU/Budapest

Intermodal Europe 2017

Intermodal Europe 2017

28-30 November 2017 • NL/Amsterdam

Third Annual Stakeholders' Conference

Third Annual Stakeholders' Conference

30 November 2017  BE/Brussels 

9th Annual Baltic Energy Summit

9th Annual Baltic Energy Summit

4-5 December 2017 • LT/Vilnius

Logistics CIO Forum EU

Logistics CIO Forum EU

6-7 March 2018  NL/Amsterdam

Breakbulk Europe 2018

Breakbulk Europe 2018

29-31 May 2018 • DE/Bremen

See more