The Hamburg-based terminal operator has invested in the FERNRIDE tech start-up from Munich, granting it access to its sea container facility in Tallinn's Muuga Harbour.
The ports of Cuxhaven, Eemshaven, Esbjerg, Humber, Nantes-Saint Nazaire, and Oostende have joined forces to speed up the green transition to meet Europe's offshore wind deployment targets.
The PSA-operated container terminal from Gdańsk has ordered 20 automated sideloaded stacking cranes for the under-construction 1.7m TEUs/year expansion.
HHLA has commissioned Linde Engineering to build the facility within the premises of the test centre for hydrogen-powered port logistics at the Container Terminal Tollerort.
After an incident in the Kiel Canal that damaged the LHM 600 mobile harbour crane ordered by the Danish seaport, the manufacturer delivered an LHM 800 High Rise on short notice instead.