Tree Energy Solutions (TES), founded by the Belgian investment company AtlasInvest, will accelerate the set-up of the facility that, once fully commissioned, could cover 10% of Germany's energy demand.
The Danish seaport has teamed up with the Californian global infrastructure advisory firm specialised in port planning to develop a digital twin for Esbjerg's future offshore wind harbour.
Wärtsilä and the Grimaldi Group are trialling an open-loop exhaust gas treatment system that traps microplastic particles before the wash water returns to the sea.
The Rotterdam-based Future Proof Shipping (FPS) has become part of the EU-supported project that aims to introduce two zero-emission inland waterway vessels.
Together with its partners Trafigura and Copenhagen Infrastructure Partners, the Wiesbaden-based company has started the Front-End Engineering Design (FEED) phase of a production plant located in the Norwegian Municipality of Sauda.
The Finnish manufacturer will deliver the all-electric, busbars-powered, automated rubber-tired gantry cranes (ARTGs) in three phases, with the delivery of the first six machines expected in Q2 2023.
Within the MEGURI2040 project, led by The Nippon Foundation, Mitsui O.S.K. Lines (MOL) and its partners have carried out two port-to-port autonomous sailings with a coastal container ship and a ferry.
The 45t of lifting capacity machinery, due for delivery in early Q4 2022, will feature a 326 kWh lithium-ion battery pack covered by a five-year warranty and an expected first life of 10-12 years.