The stevedore's operations on the Vistula Quay in Gdańsk's Inner Port have been upgraded with the Finnish hydraulic crane able to handle 1,300 tonnes of dry bulk per hour with its 14 m³ grab (manufactured by Pakiet).
The crane's 40-metre outreach makes it possible to serve Panamax and Handymax vessels.
SPEED's Mantsinen 300 arrived in parts in early September 2026 and was assembled in around nine days.
Photo: Mantsinen
