The company will carry out the ship-side basic design for retrofitting the 210k dwt Berge Olympus with four 50 m tall retractable WindWings developed by BAR Technologies and Yara Marine Technologies.
The 14.65 m long boat has started traffic between the village of Kamp on the German mainland and the island of Usedom, part of the 350 km Berlin-Usedom cycling route.
HyCC and the port authority are working on the H2era project, a 500 MW green hydrogen electrolysis production plant to be located in the Dutch seaport.
The parties have teamed up to further develop the Battery Short-Circuit Limiter (BSCL) protection device for large-scale battery solutions and advanced DC power distribution.
The French shipping line and utility company have partnered to co-invest in the Salamander project that wants to set up a second-generation biomethane production plant in Le Havre.
The Norwegian state enterprise Enova has granted NOK150m (€15m) for developing two 500 TEUs of capacity, hydrogen-powered, remotely-controlled, and autonomous-ready container carriers.