The NDI Group finished overhauling the infrastructure in question, broadening 537 metres of the quay wall with six metres, plus dredging it to 15.5 metres.
As of week 35 (25-31 August 2025), the Swedish seaport will receive calls by 15,000+ TEU carriers of Maersk and Hapag-Lloyd within their AE5 and NE4 connections, respectively.
Munck Havne & Anlæg has won the Port of Aalborg's tender for the construction of a 500-meter-long quay with 60,000 square meters of adjacent land area at the East Port.
The Port of Gothenburg and Inter Terminals Sweden (ITS) have signed a 25-year agreement, covering the lease of above-ground areas and underground rock caverns, as well as cargo port dues based on traffic and volume.
The 1.1-gigawatt joint venture offshore wind farm project of the Toronto-headquartered Northland Power and the Polish ORLEN saw the setup of the first (out of 76) V236 15-megawatt turbine from Vestas.
The two Baltic seaports will receive almost €14.2 million from the Connecting Europe Facility to carry out the Development of port capacity for an integrated Baltic Sea Link on Rostock-Hanko route; Part 2 (24-EU-TG-HARBOUR) project.
The €45-million project, run by the ports of Helsinki and Lübeck-Travemünde, will receive €22m in support of putting in place hard- & software to streamline cargo & passenger traffic.
Inter Terminals Sweden (ITS), in co-op with the Port of Södertälje, has started a front-end engineering design study for an open-access intermediate storage facility in the Swedish port for regionally captured carbon dioxide.
CMA CGM has made the Polish seaport part of the sea container loop that will connect it with Helsinki and Tallinn in the Baltic and Rotterdam, Teesport, and Zeebrugge in the North Sea.