The developer of offshore wind energy (OWE) and the Finnish Port of Vaasa signed a letter of intent concerning the construction, operations, and maintenance of the Tyrsky OWE farm.
Energos Infrastructure's 174 thousand cubic metres of capacity floating storage & regasification unit (FSRU) Energos Power has berthed at Deutsche ReGas' terminal in Mukran Port.
Gotland Alandia Cruises has contracted the Swedish Nowhere Networks to provide Internet access on board the ship, which will offer intra-Baltic cruises as of the coming spring.
Liquid Wind, Alfa Laval, Carbon Clean, Siemens Energy, and Topsoe inaugurated their Design & Performance Centre (DPC), tasked with driving technological progress, strengthening production capacity, and bringing in-demand e-fuels to market at scale.
Equinor and Polenergia have ordered 100 units of the SG 14-236 DD turbines, each with a capacity of 14.4MW, the largest turbines manufactured by Siemens Gamesa to date.
The Finnish manufacturer of auxiliary wind propulsion will see one of its Rotor Sails installed on board Baltrader's under-construction in China cement carrier.
The Swedish shipping company and the Australian shipbuilder are proceeding with their work on the former's high-speed catamaran, Horizon X (earlier known as Gotland Hydrocat).