The floating storage regasification unit (FSRU) Exemplar has been connected to the Finnish grid in the Port of Inkoo, ready to receive gas for distribution in Finland and the Baltics.
With the help of the California-headquartered Moffatt & Nichol, the Danish seaport has developed a digital twin, thanks to which Esbjerg will be able to handle 4.5GW of offshore wind components by 2025.
The Polish energy company has received the permit to start constructing the offshore wind energy (OWE) installation facility, which is due for commissioning in 2025.
The PSA-operated container terminal from Gdańsk has ordered 20 automated sideloaded stacking cranes for the under-construction 1.7m TEUs/year expansion.
HHLA has commissioned Linde Engineering to build the facility within the premises of the test centre for hydrogen-powered port logistics at the Container Terminal Tollerort.
TSG Terminal UK, part of the Swedish Thor Svecon Group, has contracted the Gothenburg-based tech company Surikat to implement their software as a service terminal operating system.
After an incident in the Kiel Canal that damaged the LHM 600 mobile harbour crane ordered by the Danish seaport, the manufacturer delivered an LHM 800 High Rise on short notice instead.