The port authority will install additional panels in the Vuosaari Harbour, on the roofs of the V6 and V7 buildings (307 in total), and atop West Terminal 2 (200).
The company will supply engines and a range of electrical solutions for the two new ferries under construction at the China Merchants Jinling Shipyard.
The 60+ member-big initiative, led by the City of Helsinki, has been set up to assist organizations in improving their eco-performance and go beyond the current legislative requirements.
The Swedish Maritime Administration and the Finnish Transport Infrastructure Agency have commissioned the Helsinki-headquartered engineering company with designing a new model of more effective, cheaper, and greener icebreakers.
The dry bulk operator has taken over a 26k m2-big, 12.5 m-tall, and fitted with six overhead cranes property that earlier served as a gas pipeline coating facility.
Thanks to the grant, the Swedish and Finnish ports, between which an EU Motorway of the Sea (MoS) runs, will carry out a joint project tasked with reducing ship-caused emissions as well as streamlining ferry operations.
ABB Marine & Ports has provided the ferry with the necessary equipment to connect to an onshore power supply facility in the Port of Tallinn (also installed by ABB - five in total across Old City Harbour's piers).
Due to unsatisfactory volumes, the Paldiski-Hanko route has been terminated - for this reason Patria Seaways, the ferry serving the link, has been moved onto the Paldiski-Kapellskär service.